You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
So I have these nodes in hundreds. Is it possible to arrange these in such a way that all the project nodes are on the left part of the canvas while the dependency nodes are all on the right part of the canvas?
reacted with thumbs up emoji reacted with thumbs down emoji reacted with laugh emoji reacted with hooray emoji reacted with confused emoji reacted with heart emoji reacted with rocket emoji reacted with eyes emoji
-
Hi, I am new to Gephi, and I would like to know if this is possible:
I have an excel file that is basically a huge list of software projects and their dependencies sorted alphabetically like this:
project_1; dependency_1
project_1; dependency_2
project_1; dependency_3
project_2; dependency_1
project_2; dependency_2
project_3; dependency_3
...
So I have these nodes in hundreds. Is it possible to arrange these in such a way that all the project nodes are on the left part of the canvas while the dependency nodes are all on the right part of the canvas?
Beta Was this translation helpful? Give feedback.
All reactions