Notifications
You must be signed in to change notification settings - Fork 889
New issue
Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.
By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.
Already on GitHub? Sign in to your account
[teoz] [bug] [sequence] Activation is offset when with simultaneous deactivation #1723
Comments
I just wanted to let you know that I am looking at these teoz related lifeline issues. I've already found the solution for the --++ condition, but I'm looking at some related problems when & is used. So, my solution results in the teoz version looking very much like the puma version. Here's with my changes (not yet submitted): |
… Timeline issues, with some non regression tests.
Could you have also a look on: @startuml
activate a
a -> a : put
deactivate a
@enduml Thanks for your work. |
Yes @The-Lum, I had planned to return to the self message lifeline since for forum issue #15191 where the deactivation position changes depending on if it is the last message in the script or not. In looking at the backlog#9 discussion, I realize the changes I needed to make to solve the --++ issue has stopped one of the workarounds for extending the self message activation, the use of delay as in:
For the --++ fix to work, I had to relax how many instructions away the deactivate occurs, since for --++ and some other conditions the activate could sometimes come before the deactivate and the processing was only looking at the very first of them (which is why --++ wasn't working). I had to do some additional relaxation in order to fix some of the parallel message issues. I haven't had a chance to see what it would take to get the ||0|| to force the delay in the deactivation again. Also, I think we need both kinds of activation level endings on the self message. I notice that for the slanted messages, such as the following, PlantUML uses the arrow type to determine whether the deactivation should occur at the time the message is sent (if an async arrowhead
Maybe self messages should have the same logic. Right now, it defaults to the form of a message return, where the source is deactivated and returns to the next lower state, as in:
Maybe there should be a new discussion or issue created for this. I'm not clear what the correct default and solution should be. Though I do believe I should restore the effect that ||0|| had prior to my other changes. Jim N |
Hi @The-Lum, As I said, the self-message issue we discussed here late last week should be a separate issue than the --++ problem reported here by @valtusovs in April relating to --++ causing problems with the activation levels, which was fixed in release 1.2024.5. So, can you please close #1723? Thank you, P.S. As for our separate discussion of self message deactivation, I had mentioned a new problem with using ||0|| to delay the deactivation on the self-messages. The fix for that was merged on Friday, in pull request #1803. Again, though, further discussion about the self-message problems should be moved to another issue, since it is an older issue and not related to --++ nor just teoz. Regards. |
Hi all, [This is an Issue Review] 👀 This is now fixed on V1.2024.5.
Regards. |
Describe the bug
When using teoz engine on the latest plantuml-1.2024.3.jar. When making a sequence diagram. When deactivating actor A and activating actor B, the B's activation box does not start at the arrow.
To Reproduce
Steps to reproduce the behavior:
Copy this file:
Save the resulting diagram.
Comment out "!pragma teoz true". Save the resulting diagram.
Expected behavior
The activation box of actor B starts at the "second step" arrow, like in the puma render.
Screenshots
teoz:
puma:
The text was updated successfully, but these errors were encountered: